The Last Office Floors in a 43-Story Downtown Crossing Tower Could Become 98 Apartments
A Project Notification Form for 250 Washington St. would convert 122,300 square feet of office space on floors two through eight into housing. Public comment runs through Dec. 10.

The owners of One Devonshire Place, the 43-story tower at 250 Washington St. in Downtown Crossing, have filed plans with the Boston Planning Department to convert the building's remaining office floors into 98 apartments. If approved, the change would make the tower, which already holds apartments on its upper levels, entirely residential above the lobby.
The filing, submitted by Devonshire Conversion LLC, is a Project Notification Form seeking Article 80B Large Project Review and a scoping determination, according to the Boston Planning Department's public notice. The conversion would affect 122,300 square feet of office space on the second through eighth floors. The city's notice lists Dec. 10, 2026 as the end of the public comment period.
The tower was developed by Ruben Companies of New York and completed in 1983, according to Banker & Tradesman. It totals 665,000 square feet and stands across from Pi Alley, with a driveway that extends to Devonshire Street. Ruben Companies selected the Cambridge firm CambridgeSeven to design the reuse project.
According to designs submitted to the city, each of the seven office floor plates would be divided into up to 15 apartments. Developers also plan to replace windows on the conversion floors and update mechanical systems, Banker & Tradesman reported from the Project Notification Form. The project is expected to take about 18 months, and the developers are targeting a construction start in the first quarter of 2027.
The project team includes legal counsel DLA Piper, permitting consultant Epsilon Associates, civil engineer and transportation consultant Nitsch Engineering and mechanical engineer R.W. Sullivan, according to the filing.
The proposal arrives as Boston pushes to turn underused office space into housing. The city's office-to-residential conversion program, launched in 2023, offers property tax abatements of 75% for 29 years to qualifying projects. To date, the city has received 28 applications covering 35 buildings and 2.1 million square feet, with the potential for 2,420 housing units, Banker & Tradesman reported. The filing does not by itself establish whether this project will seek or qualify for that abatement.
The 250 Washington application was received two days before city officials approved the largest project to date under the conversion program: VanBarton Group's plan for 476 apartments at 31 St. James Ave., which will be rebranded as 140 Providence St. The Boston Planning & Development Agency board approved that project at its meeting last Thursday.
The One Devonshire proposal differs from many conversion projects because the building is already largely residential. Rather than reworking a full office tower, the developers are proposing to convert seven floors sitting between the ground-floor lobby and existing apartments above. Floor plates designed for offices can be difficult to convert because of their depth and window placement, and the plan to replace windows and mechanical systems on the affected floors reflects that work.
The filing also lands in a week when the City Council voted to eliminate off-street parking minimums for new residential development, and when Mayor Michelle Wu proposed easing some inclusionary zoning requirements to help housing projects secure financing. Both measures still require further approval.
Residents can submit comments on the proposal through the Boston Planning Department's project page until Dec. 10. Outstanding questions include whether any of the 98 units would be income-restricted, what the unit mix would be and whether the conversion will apply for the city's tax abatement program.
Sources
- Boston Planning Department: public notice, 250 Washington Street Project Notification Form (opens in a new tab)
- Boston Planning Department: 250 Washington Street project page (opens in a new tab)
- Banker & Tradesman: Downtown Crossing tower seeks to add 98 apartments (opens in a new tab)
- Universal Hub: Mostly residential tower in Downtown Crossing could become all residential (opens in a new tab)


